JOB PLAN
AI Job Planning
1. Building regs + structural calcs
Week 1 · pre-start
2. Steel beam install + new floor
Week 2-3 · 2 trades
3. Dormer build + roof + windows
Week 4-5 · weather-sensitive
4. First fix, plaster, second fix
Week 6-8 · finishing
Describe the job and the AI creates a structured plan: phased work schedule, materials list in order of need, labour allocation, and timeline estimates. Like having a project manager in your pocket.
Tell the AI what you're doing: “Loft conversion, dormer, en-suite, 4 weeks target.” Add photos for extra context.
Receive a phased breakdown: groundworks, first fix, second fix, finishing. Each phase includes materials, labour, and duration.
Follow the plan, order materials on schedule, and keep customers updated with clear timelines.
Every project broken into clear phases with dependencies. Know exactly what comes next.
Materials listed in order of need. No more ordering everything upfront or running out mid-job.
AI-calculated durations based on job scope. Set customer expectations accurately from day one.
Know how many people you need per phase. Plan subcontractors and labourers efficiently.
The AI flags potential issues — access restrictions, weather-sensitive phases, long-lead materials — before they become problems.
Share clear, professional project plans with customers. Build trust with transparency.
The hidden cost of bad planning isn’t the one big disaster — it’s the accumulation of small delays that eat into every project. Materials ordered too early sit in a van and get damaged. Materials ordered too late hold up a phase and leave a customer without hot water for an extra day. A subcontractor booked too early waits around on your invoice; booked too late and you’re scrambling to reschedule a week of work. Each of these is avoidable with a clear phase plan, but writing one from scratch for every job takes time most tradesmen don’t have.
Timeline overruns also damage relationships and reputation in a way that’s hard to recover from. A customer who was told “two weeks” and experienced three has a story they tell. A customer given a written plan with clear phases, who sees the job finish on schedule, becomes a referral source. The quality of the work matters — but so does the experience of having the work done.
Take a bathroom refurbishment as an example. A proper plan breaks it into: stripping out (day one — skip delivery, removal of suite, checking for damp); first fix plumbing and any electrical (day two — waste run, hot and cold supply, extract fan circuit); tiling (day three to four — walls first, floor last, adhesive cure time built in); second fix (day five — suite, fittings, connections); and snagging and sign-off (day six). Materials appear in the order they’re needed: skip first, then board and adhesive, then suite and fittings, so nothing is ordered and stored unnecessarily.
The AI produces plans at this level of detail automatically. You describe the job, it generates the phases, and you edit anything that doesn’t match how you work. The result is a plan you can hand to a customer, use to brief a labourer, or follow yourself on a complex job where keeping track in your head isn’t reliable.
Loft conversions, extensions, and full bathroom or kitchen refurbishments typically involve more than one trade. Getting the sequencing right between groundwork, structural, first fix, and finishing trades is the difference between a smooth project and one where a plasterer arrives to find the electrician hasn’t finished first fix. The AI understands trade dependencies and builds them into the plan — flagging where one phase must complete before the next can start.
For the main contractor coordinating subcontractors, this removes one of the most stressful parts of the job: holding the schedule in your head. A written plan gives every trade a reference point, a clear briefing, and a shared understanding of where they fit in the sequence. It’s also useful when a phase overruns and you need to explain to the next trade why their start date has moved.
| Metric | Without AI | With AI |
|---|---|---|
| Time to plan a job | 30–60 minutes manually | 5 minutes |
| Material sequencing | Often wrong, causes delays | Auto-sequenced by phase |
| Timeline accuracy | Experience-based guesswork | Consistent AI calculation |
| Customer expectations | Verbal estimates that slip | Written, shareable plan |
| Missed dependencies | Common cause of delays | Flagged before work starts |
Very detailed. Each plan includes phased work schedules, material lists with quantities, labour requirements, timeline estimates, and notes on dependencies between phases.
Yes. Every element is fully editable. Add phases, adjust timelines, modify material quantities, or restructure the work schedule as needed.
Yes. The AI handles everything from half-day repairs to multi-month construction projects, scaling the detail level appropriately.
Yes. Generate a professional PDF of the project plan to share with customers, showing them exactly how the work will progress.
Yes. The phased plan shows which trades are needed at each stage, making it straightforward to brief and book subcontractors in the correct order. You can share the relevant phases with each trade.
For planned projects, the AI produces detailed multi-phase plans. For reactive jobs — emergency callouts, quick repairs — it produces a simpler task list and material checklist, scaled to the scope of the work.
Open the plan, describe the change, and the AI revises the affected phases. You can also edit phases directly. The updated plan can be resent to the customer as a revised PDF.
AI Job Planning works for every trade. See how it fits yours.