FREE TOOL · BUILDERS
Calculate exactly how many bricks, blocks, and mortar bags you need for any UK wall — single skin, cavity, or solid brick — including openings, bond pattern, and 2026 material cost estimates.
Stretcher: 60/m² · English: 80/m² · Flemish: 75/m²
Bricks Required
626
inc. 10% wastage
Cost note: Material costs are mid-range estimates for 2026 (facing brick ~65p, medium-density block ~£2.75, ready-mix mortar ~£8/bag). Prices vary significantly by region, supplier, and brick type. Always get merchant quotes before issuing a final estimate to a client.
Next step
Turn these figures into a professional PDF quote or invoice — free, no account needed to start.
UK brick counting is based on standard BS brick dimensions and established bricks-per-square-metre rates for each bond pattern.
Net area = (wall length × wall height) − (number of openings × average opening width × average opening height). Material is only needed for solid walling — openings (doors, windows) are deducted from the gross area. For complex walls with multiple different-sized openings, calculate each opening separately and sum the total deduction.
Standard UK bricks (215mm × 102.5mm × 65mm) in stretcher bond with a 10mm joint produce 60 bricks/m². English bond (alternate header and stretcher courses) requires 80 bricks/m² because every other course lays the brick perpendicular, using two brick thicknesses. Flemish bond (alternating headers and stretchers in each course) produces approximately 75 bricks/m². Wider 12mm joints reduce counts slightly. Blocks (440mm × 215mm × 100mm) in stretcher bond with a 10mm joint produce 10 blocks/m².
A minimum 5% waste should always be added for cutting around openings and at corners. 10% is standard for domestic brick and blockwork. Complex elevations, heritage brick matching, irregular bond patterns, or large numbers of cut bricks at openings warrant 15%. Never order without waste — short deliveries mid-job cost far more in re-ordering and delivery fees than the surplus bricks.
Ready-mixed mortar: approximately 1 × 25kg bag per 50 standard bricks in stretcher bond, or 1 bag per 10 medium-density blocks. For a site-mixed 1:1:6 mortar (cement:lime:sand), allow approximately 0.5 bags of cement, 0.25 bags of lime, and 3 bags of sharp sand per m² of single-skin brickwork. Always add 10–15% to mortar quantities — waste from board drying, splashback, and pointing is inevitable on site.
WORKED EXAMPLE
Dave is a bricklayer pricing a rear extension in Birmingham. One external wall is 6m long × 2.4m high with a single 1.2m × 1.2m window. Cavity wall (brick outer, block inner), stretcher bond, 10mm joints, 10% wastage.
Gross area
6 × 2.4 = 14.4 m²
Opening deduction
1 × 1.2 × 1.2 = 1.44 m²
Net area
12.96 m²
Bricks (60/m² + 10%)
857 bricks
Blocks (10/m² + 10%)
143 blocks
Mortar bags
857÷50 + 143÷10 ≈ 32 bags
Total material estimate
~£1,110
857 bricks · 143 blocks · 32 mortar bags — materials only, excl. delivery & labour
Cost estimates are indicative. Always get live merchant prices before quoting — brick costs vary significantly by region and specification.
Estimate total cost of a single or double storey extension.
Set your sell price and see the true margin on materials.
Calculate total labour cost including NI and travel.
See exactly how much you make on any job after all costs.
Add the right overhead recovery and profit to every quote.
Calculate your income tax, NI and monthly set-aside.
Calculate CIS amounts to deduct and pay to HMRC.
Calculate the right day rate for builders by trade and region.
Estimate roof replacement cost by area, pitch, and material.
Estimate driveway installation cost by material and size.
STOP UNDERCHARGING
You've counted the materials. Now turn it into a professional quote in minutes. Sleepless Tradesman quotes, invoices and plans every job — for free, no card required.
No card · No commitment · Cancel anytime
Common questions about brickwork quantities and materials.
For standard UK bricks (215mm × 102.5mm × 65mm) in stretcher bond with a 10mm mortar joint, the brick count is 60 bricks per m². English bond uses 80 bricks/m² because alternate courses are laid as headers, effectively using two bricks where stretcher bond uses one. Flemish bond (alternating headers and stretchers in each course) uses approximately 75 bricks/m². At 12mm joints the counts drop slightly: stretcher 56/m², English 75/m², Flemish 70/m².
A common rule of thumb is one 25kg bag of ready-mixed mortar per 50 standard bricks in stretcher bond. For a site-mixed 1:1:6 mortar (cement:lime:sand by volume), you need approximately 0.5 bags of cement and 3 bags of sand per m² of single-skin brickwork. For cavity wall construction, calculate mortar for each leaf separately. Always add 10–15% waste to mortar calculations — wastage from pointing, spillage, and board drying is inevitable.
Common (or engineering) bricks are used below DPC, in foundations, and for internal walls — they are durable but not aesthetically finished. Facing bricks have a decorative surface on one face and are used for external visible walls. Stock bricks (a regional type) are semi-handmade and vary in texture. In 2026, common bricks cost £0.25–£0.45 each; basic facing bricks cost £0.50–£0.80 each; premium handmade bricks can exceed £2.00 each. The calculator uses a mid-range facing brick price of approximately £0.65.
Dense concrete blocks (solid, 7.3 N/mm²) have a U-value conductivity of around 1.13 W/mK — poor insulation. Medium-density hollow blocks are better (~0.57 W/mK). Lightweight aircrete blocks (Thermalite, Celcon, etc.) at 100mm thick achieve around 0.11 W/mK, making them very good insulators. Standard bricks are approximately 0.77 W/mK. In a modern Part L-compliant cavity wall, the insulation layer in the cavity dominates the thermal performance — the block and brick type matters less than the cavity fill.
A standard pallet holds 400–500 bricks. At £0.50–£0.80 per brick (mid-range facing brick), a pallet costs £200–£400 plus delivery. Delivery typically adds £50–£150 depending on distance and supplier — for large jobs, negotiate delivered pallet prices directly with a builders' merchant. Prices rose sharply in 2022–2024 due to energy costs in brick kilns; 2026 prices have stabilised but remain 20–30% above pre-2022 levels.
Cavity walls in England must comply with Part C (moisture resistance), Part L (thermal performance), and Part A (structural). The minimum cavity width is 50mm for insulated cavities under current Part L 2021; most new-build full-fill insulation is 100mm cavity. Wall ties must comply with BS EN 845-1 and be spaced at no more than 900mm horizontal, 450mm vertical in standard conditions. The U-value target for new-build walls is 0.18 W/m²K under Part L 2021.
Industry standard wastage for standard brickwork is 5% for straightforward rectangular walls and 10–15% for walls with many openings, complex bond patterns, or site-cut bricks. For block work, 5–10% is typical. The calculator defaults to 10% waste, which is appropriate for most domestic extensions and new builds. For heritage restoration work using handmade bricks, increase wastage to 15–20% to account for breakage and matching variations.